Front of the house with the second floor framing started. Garage on right, front door on the left.
Tuesday, July 21, 2009
New House: Lots is done!
Well it has been a while since I have posted house pictures and A LOT has been completed since then. The second floor is up and walls have been framed upstairs as well. Today the roof trusses were put up, but we don't have pictures of it yet. Here are pictures from the last few days.
Front of the house with the second floor framing started. Garage on right, front door on the left.
Upstairs, from the front right corner of the house, in the master bedroom. Looking towards back bedrooms.
Standing in back left corner bedrooms. Looking towards master suite area in the far side of the picture.
Papa and Cam standing in the fireplace. Also, this is where Cam keeps his stash of nails that he collects every time we go to the site. He has hundreds in the stash!
Back of the house.
Upstairs, now with walls. This is standing at the top of the stairs, looking toward master bedroom and laundry room.
Standing in the doorway of the laundry room. There will be a closet in the laundry (on the left side of the picture) and then the laundry sink, washer and dryer.
Standing in the laundry doorway, looking back towards the other bedrooms and the stairway.
Taken from the back left bedroom, which will be Cameron's.
In the foreground of the picture is the Jack-n-Jill bath, which is shared between the two bedrooms. In the background is the front left bedroom.
Cam, standing in an odd little area that may eventually become a small built-in bookshelf. Cam loves wandering around the house and is really interested in how it is being built. Well, as interested as a one and a half year old can be. :-P
Front of the house with the second floor framing started. Garage on right, front door on the left.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment