The house is coming along pretty quickly now. These pictures were taken last week, but even since then a lot has been done. We are keeping our fingers crossed that our house will be ready in a week or two.
The kitchen cabinets are all in, and so are the appliances.

Laundry room - everything is done except for the laundry sink and counter top (and the washer/dryer, of course)

The master bathroom with the tiling almost done. They still need to paint above the tile, and add another row on the left side of the shower. Then they will put up the glass wall and door.

The completed stairs and banister

Cameron really wanted to be in a picture showing something, so in this picture he is showing the inside of the cabinet (his choice).

Since these photos were taken, the carpet has gone in, all of the lights are pretty much done, and we are on our third tub. Yes, that is right, the third tub! The first one had a chip in it (you can see it in the bathroom photo above), then the replacement had some other mess-ups in it. So right now the third tub is sitting in our closet, waiting to be installed.
This post also sat in draft for a while so its about a week old. We have newer pictures but just haven't gotten around to putting them up yet. I'm going to go ahead and post this and hopefully soon we will get the others up.